Answers are grounded in this paper and cite their sources.
During severe emergencies which result in insufficient generation to meet load, an automatic load shedding program throughout the affected area can prevent total area collapse. It also helps to achieve fast restoration of all affected loads. This paper describes the factors involved in applying underfrequency relays to achieve a desired "deficient generation" protection level and a calculating method to achieve optimum relay settings.
No takes yet. Share an insight, caveat, or question.
Lokay et al. (1968) studied this question.
Synapse has enriched 5 related papers. Consider them for comparative context: