Answers are grounded in this paper and cite their sources.
The need to model uncertainty in process design and operations has long been recognized. A frequently taken approach, the two-stage paradigm, involves partitioning the problem variables into two stages: those that have to be decided before and those that can be decided after the uncertain parameters reveal themselves. The resulting two-stage stochastic optimization models minimize the sum of the costs of the first stage and the expected cost of the second stage. A potential limitation of this approach is that it does not account for the variability of the second-stage costs and might lead to solutions where the actual second-stage costs are unacceptably high. In order to resolve this difficulty, we introduce a robustness measure that penalizes second-stage costs that are above the expected cost. Incorporating this measure into stochastic programming formulations does not introduce nonlinearlities, thus making possible the solution of large-scale problems through linear programming techniques. The proposed framework is applied to the planning of chemical process networks for which we propose a number of specialized models and solution schemes.
No takes yet. Share an insight, caveat, or question.
Ahmed et al. (1998) studied this question.
Synapse has enriched 10 related papers. Consider them for comparative context: