Answers are grounded in this paper and cite their sources.
The article presents the results of field studies in the area of the Belarusian NPP in the pre-operational period. The «background» contents of gamma-emitting radionuclides in individual components of the environment are determined. The main array of dose rate measurements in the area of the NPP construction site is in the range 0.048 ÷ 0.089 μSv/h. External radiation in the surveyed area is formed at 96% due to 40K, 226Ra and 232Th. The information obtained can be used to correctly interpret the data of future radiation monitoring during normal operation of nuclear power plants.
No takes yet. Share an insight, caveat, or question.
Екидин et al. (2020) studied this question.
Synapse has enriched 10 related papers. Consider them for comparative context: