Answers are grounded in this paper and cite their sources.
A cancer trial with an immunotherapy or antibody drug conjugate often has a certain delay/crossing time before the drug to take effect. In this paper, we propose to call the events that occur during and after the delay/crossing time as non-informative events and informative events, respectively. We propose to call the rate of number of informative events divided by total number of events as informative event rate (γ), though this rate has been used in the literature. We show three innovative usages of γ under non-proportional hazards (NPH) setting: (1) based on γ, the minimum average hazard ratio (aHRmin) can be calculated analytically and used to determine whether trials are worth being conducted for a test drug to get a meaningful average hazard ratio (aHR) at the planning stage; (2) based on a series of γ, aHR and power can be calculated and a proper design can be selected for a trial with a targeted aHR at the design stage; (3) based on γ, a better interim analysis timing to ensure a certain probability for early efficacy/futility stopping can be determined during the course of a study. aHR and the probability for early efficacy/futility stopping under different enrollment scenarios in a simulation were verified by calculation. We propose the concepts of the informative event rate (γ), aHRmin, and a targeted aHR and use them in study determination, study design, and interim analysis monitoring under an NPH setting with a delay/crossing time.
No takes yet. Share an insight, caveat, or question.
Liu et al. (2025) studied this question.
Synapse has enriched 10 related papers. Consider them for comparative context: