Railway cable-stayed bridge construction is characterized by high complexity and substantial safety risk. Deficiencies in safety control may result in serious accidents (e.g., collapse and falls), causing significant casualties and economic losses; therefore, clarifying risk interactions and accident-causing mechanisms is essential. This study proposes a fuzzy DEMATEL–ISM approach in which fuzzy sets capture uncertainty in experts’ linguistic assessments. DEMATEL quantifies influence strengths and causal relationships among factors, and ISM constructs a multi-level hierarchy to explain accident causation. Twenty safety influencing factors are identified and grouped into five categories: management, human, material and equipment, construction technology, and environmental conditions. The obtained accident-causing mechanism comprises seven hierarchical levels: L1: collapse and fall accidents, L2: direct factors, L3–L5: indirect factors, and L6–L7: root factors. This mechanism is a chain of events that leads to an accident, with the nodes improper prestressing, structural deformation and differential settlement. These key nodes can be avoided by reinforcing safety management system implementation, daily supervision and inspection, and education and training on the subject of safety to ensure the safety of railway cable-stayed bridge construction.
Zhang et al. (Sat,) studied this question.