Answers are grounded in this paper and cite their sources.
Continuous process improvement is critical for organisations to stay in business. An automotive component manufacturer faced productivity challenges after the launch of a new hybrid C-SUV automobile in South Africa. This paper aims to improve the seat cover sewing process line through a line balancing technique. The use of process standard times to balance the production process initially led to bottlenecks, and the cycle time was above the takt time of the assembly line. Through the use of work-study analysis and time studies, the bottleneck processes were identified. Elements were then categorized, and kaizen implementation occurred at the processes. The processes were then rebalanced to meet the calculated cycle time. A root cause analysis was also conducted to investigate the sources of muda and the factors affecting the rate of working. The assembly line was then rebalanced, and the balance delay decreased by 33%. Keywords Bottlenecks; Kaizen principle; Muda
No takes yet. Share an insight, caveat, or question.
Govender et al. (2022) studied this question.
Synapse has enriched 10 related papers. Consider them for comparative context: