Investigates prestress transfer in concrete using sand-coated CFRP tendons, highlighting bond stress effects.
Pull-out tests are standard procedures to assess the bond between reinforcement and concrete. They allow to compare the effectiveness of the bond of different rebars or tendons. Those mostly quasi-static tests investigate mainly the short-term behaviour for small embedment lengths, where a reasonably uniform bond stress is assumed. This, however, does not reflect the situation in prestressed structures, where non-uniform bond stresses and longer transfer lengths result and where the pretensioning load needs to be sustained for the whole service life of the structure. For that reason, the transfer length of sand-coated carbon fibre-reinforced polymer (CFRP) tendons was studied here using embedded distributed fibre optic sensors (DFOS). The strain distribution of superior measurement quality enabled the calculation of the local bond stress and the local slip. This allowed a comparison of bond stress vs. slip curves of several experiments together with pull out results. Prisms of different size and beams were studied, all pretensioned using sand-coated CFRP tendons with tendon stresses up to 1700MPa. Different bond mechanisms were identified, leading partially to high variations in the transfer length. Furthermore, the long-term prestress transfer length of prisms was measured for more than 500 days. The transfer length increased by approximately 8% after 500 days vs. 28 days. Based on those results, a logarithmic creep law was proposed, which allows to predict the transfer length as a function of time. Finally, the bond between tendon and concrete was analysed using visual inspection of split prisms, X-ray tomography and optical microscopy.
No takes yet. Share an insight, caveat, or question.
Ott et al. (2026) studied this question.
Synapse has enriched 10 related papers. Consider them for comparative context: