Answers are grounded in this paper and cite their sources.
A method to estimate the value of construction projects is illustrated that in an uncertain environment will result in the maximization of long-run profits to the construction firm. The risk of a project is valued relative to the size of the firm and to the relations between current and proposed projects. The information used is obtained from a subjective or statistical evaluation of the estimates for construction projects and from the balance sheet of the firm. The ways in which the risk of a project changes with diversification and with the progress of current projects are illustrated. An example shows how a firm can apply these methods to select portfolios of construction projects. The computational aspects are stressed.
No takes yet. Share an insight, caveat, or question.
Handa et al. (1980) studied this question.
Synapse has enriched 10 related papers. Consider them for comparative context: