Essential basic data of scheduling linear construction sites are subject to stochastically variable influence factors, e.g., weather conditions. To evaluate economical low-cost alternatives which determine the production sequence of segments of a linear site through a projected construction time, a mathematical model is developed which is formulated as a two-stage stochastic linear programming problem and can be solved by standard linear programming methods. Criteria for interpretation and evaluation of model solutions in terms of a time-velocity diagram are derived and illustrated with a simple example problem. By means of stability analysis, risk factors and probability distributions of project duration and cost can be obtained for different construction alternatives to prepare a final decision. It is emphasized that the methodology presented is not seen as an approach to determine the optimal decision, but rather as a tool to facilitate decision making, since this ultimately relies on practical engineering judgment.
No takes yet. Share an insight, caveat, or question.
Joachim Dressler (1974) studied this question.
Synapse has enriched 10 related papers. Consider them for comparative context: