Answers are grounded in this paper and cite their sources.
Short-term multi-product production planning strongly depends on manifold considerations which can be related to backlog production, product-type prioritization, machine capacity, and set-ups. Different manufacturing systems conditions may lead to different objectives. In this context, it is rather difficult to define a-priori optimal production plans. This paper presents an effective approach for short-term production planning of multi-product systems based on the integration of a Digital Twin and a multi-objective optimization method. The proposed approach has been implemented in a real industrial case of the railway sector. Numerical results show that useful insights can be inferred from the proposed methodology.
No takes yet. Share an insight, caveat, or question.
Magnanini et al. (2021) studied this question.
Synapse has enriched 10 related papers. Consider them for comparative context: