Demonstrates improved construction progress prediction in project management, highlighting significant data integration techniques.
A construction progress prediction model based on BIM and ABC-SVM is proposed to predict and control the construction progress. Firstly, a construction progress influencing factor index system consisting of 24 secondary indicators was constructed from 7 dimensions including personnel, machinery, management, and environment; Furthermore, by integrating heterogeneous data from multiple sources through BIM technology, effective extraction and fusion of construction information can be achieved based on information entropy theory; Finally, the artificial bee colony (ABC) algorithm was employed to automatically optimize the key parameters of the SVM, and an ABC-SVM prediction model was constructed. The experimental results show that the average absolute percentage error (MAPE) of the model is 5.82% (95% CI: [5.08%, 6.56%]), and the coefficient of determination reaches 0.82, which is significantly better than the comparison method; Sensitivity analysis identified 8 highly sensitive factors, including mechanical equipment failure (MAPE change rate +2.5%) and worker proficiency (+2.3%); The ablation experiment verified the key role of BIM data fusion and ABC parameter optimization in improving prediction accuracy. This model provides a reliable progress prediction tool for project managers and has important practical value in improving the level of construction progress management.
No takes yet. Share an insight, caveat, or question.
Kong et al. (2026) studied this question.
Synapse has enriched 10 related papers. Consider them for comparative context: