Survey examines renewable energy support systems in Britain, proposing reforms for efficiency and cost.
This article surveys Britain’s groping attempts at delivering adequate volumes of RES at an acceptable system cost, and proposes reforms to support design and transmission charging. Littlechild as the first electricity regulator oversaw the first auctions for renewable electricity contracts. Renewable Obligation certificates added a premium to the market price and accelerated deployment at high cost, until replaced by Contracts for Difference for wind and solar PV, now auctioned. Firm access and locational transmission pricing can work if support is suspended in negative price periods and transmission charges for new entrants are based on marginal expansion costs. The proposed new subsea HVDC links from Scotland would require new windfarms to have capacity f actors of 50% to compete with windfarms in England of 34% capacity factors, while onshore links would deliver at current modest transmission charges.
No takes yet. Share an insight, caveat, or question.
Green et al. (2026) studied this question.
Synapse has enriched 5 closely related papers on similar clinical questions. Consider them for comparative context: