Answers are grounded in this paper and cite their sources.
Despite the widespread adoption of Building Information Modeling (BIM) and lean construction, many projects in developing countries still struggle with efficient coordination and execution. Integrating BIM with the Last Planner System (LPS) offers a promising way to improve planning reliability and workflow. However, achieving effective integration requires a structured approach consistent with the Project Management Body of Knowledge (PMBOK) to support informed decision-making and continuous learning. This study introduces a structured model for integrating BIM and LPS using the PMBOK framework. The research involves four steps: identifying and validating evaluation criteria; weighting them using the fuzzy stepwise weighted average ratio analysis (SWARA); prioritizing project objectives using the fuzzy combined compromise solution (CoCoSo); and developing a conceptual integration model with execution strategies. The results indicate that financial and time savings are the highest priorities from the perspectives of stakeholders, cost, time, quality, and risk. Financial savings and time savings rank first and second with scores of 7.730 and 7.433, respectively. Improvements in operational efficiency and reductions in construction waste follow, with scores of 7.081 and 6.826. The proposed conceptual model provides a structured pathway for BIM-LPS integration that supports practical application in construction education and industry.
No takes yet. Share an insight, caveat, or question.
Lotfi et al. (2026) studied this question.
Synapse has enriched 10 related papers. Consider them for comparative context: