This paper presents an open shop scheduling problem based on a real mechanical workshop made of m machines that process n jobs. It deals with different resource constraints related to the tools allocation and the multi-skills staff assignment. Resource skills and their availability are required to execute one process task. In this work, we expose a multi-objective problem where the idea is to minimize three objectives simultaneously. The first one considers the minimization of the total flow time of jobs in the production system, then the workload balancing concerning both, humans and machines is addressed. We propose and compare two multi-objective methods: NSGA-II and NSGA-III. Computational experiments are designed according to the literature, we expose the small and large sized instances to present the general performance of these algorithms using the hyper-volume metric to compare them.
No takes yet. Share an insight, caveat, or question.
Campos et al. (2016) studied this question.
Synapse has enriched 3 closely related papers on similar clinical questions. Consider them for comparative context: