Answers are grounded in this paper and cite their sources.
A long-term runoff monitoring was carried out in a highway drainage system in Winterthur, Switzerland. Several runoff quantity simulations were carried out using the distributed model ‘InfoWorks-CS’. Serial rainfall monitoring data were used for investigation of water runoff behaviour from the highway. The inter-event time definition was calculated from the runoff simulation and applied for better accurate runoff volume determination. Under continuous rainfall condition, the quantity simulation showed a good agreement with the measured hydrograph. However, in some cases where rainfall was not continuous, overestimation of runoff volume and difference in peak height/timing was found after rainfall halting. It was believed that the initial/depression loss on road surface was recovered during the halting period of rainfall and caused the difference in the runoff volume and peak height/timing difference in simulation. The consideration of regenerated depression loss significantly improved runoff simulation results in the on-and-off type rainfall events. This result showed that it was essential to estimate the inter-event time definition to consider appropriateness of the initial or intermediate loss.
No takes yet. Share an insight, caveat, or question.
Aryal et al. (2007) studied this question.
Synapse has enriched 10 related papers. Consider them for comparative context: