Experiments and analysis of the ability of gas insulated transmission lines (GIL) to withstand short-circuit electro-magnetic forces are reported. In order to investigate the effect of short-circuit force on certain parts, special test units of 154kv and 275kV rated GIL were constructed for the tests. No problems occurred with these parts in the tests under short-circuit current up to 20% larger than the specified value. Equations for calculation of short-circuit forces in GIL bonded at both ends were derived and compared with the test results. Further calculations were performed under various conditions which might occur in commercial lines.
No takes yet. Share an insight, caveat, or question.
Mori et al. (1981) studied this question.