Answers are grounded in this paper and cite their sources.
A flow-controlled dispatching methodology is developed for balancing workload assignments in an industrial job shop manufacturing environment. Indices are derived for measuring the workload balance over a horizon of scheduling periods. A general simulation model is used to compare the flow-controlled dispatching methodology with standard dispatching rules. The flow-controlled methods are shown to yield significant improvements in the workload balance index as compared with any of the standard dispatching rules tested.
No takes yet. Share an insight, caveat, or question.
Deane et al. (1972) studied this question.
Synapse has enriched 10 related papers. Consider them for comparative context: