Answers are grounded in this paper and cite their sources.
Multi-manned assembly line balancing problems are usually occurred in plants producing large-sized high-volume products such as automobiles and trucks. In this paper, a cost- oriented objective function is presented for a multi-manned assembly line balancing problem. This kind of objective function may be used to balance final assembly lines of products in which manufacturing process is very labor intensive. A mixed-integer mathematical programming model is proposed to solve the problem optimally. The proposed formulation has been used to solve some small size problems by considering both time-oriented and cost-oriented objective functions. The experiments show that, given the same precedence graph of multi-manned assembly line with a same cycle time, two different optimal solutions can be actually found when switching from time-oriented to cost-oriented objective functions, and vice versa. This difficulty increases the complexity of the cost-oriented multi-manned assembly line balancing problems with respect to the multi-manned assembly line balancing problems addressed in the literature.
No takes yet. Share an insight, caveat, or question.
Roshani et al. (2015) studied this question.
Synapse has enriched 10 related papers. Consider them for comparative context: