Answers are grounded in this paper and cite their sources.
For any one control area, the rest of the interconnection is considered as one equivalent area. System time error and inadvertent interchange energy of an area are considered as a vector with two coordinates. This vector can be decomposed into two vector components: a component caused by the area itself, and a component caused by the rest of the interconnection.
No takes yet. Share an insight, caveat, or question.
Fouad et al. (1985) studied this question.
Synapse has enriched 10 related papers. Consider them for comparative context: