Answers are grounded in this paper and cite their sources.
In this paper, a heuristic approach is considered for the distributed generator (DG) placement to minimize system loss. The constriction-factor particle swarm optimization method is used as an optimization tool for the planning problem. A Monte-Carlo-simulation-based probabilistic load flow is proposed to find the unavailability of the DGs in the planning problem. The net-present-value analysis of the planning in electricity-market scenario is carried out for biomass, wind, solar-photovoltaic, and diesel-engine DGs to see their viability under bilateral- and competitive market scenarios. Various factors such as profit, incentives on capital, replacement, startup, operation, and maintenance costs have been taken into account. The proposed market-based analysis is simple and generic, and can provide choices to the distribution utilities to select DGs under various constraints. The effectiveness of the proposed method is tested on 16-, 33-, and 69-bus distribution systems, and results are compared with an improved analytical method suggested in literature.
No takes yet. Share an insight, caveat, or question.
Jain et al. (2012) studied this question.
Synapse has enriched 10 related papers. Consider them for comparative context: