Answers are grounded in this paper and cite their sources.
This research modeled and analyzed the key success factors in linear projects within the construction industry using lean construction techniques. These projects often encounter challenges such as high waste levels, repetitive operations, delays, resource mismanagement, and outdated processes, leading to increased costs and time overruns. To address these issues, the research focused on implementing lean methods, specifically the Last Planner System (LPS), Value Stream Mapping (VSM), Building Information Modeling (BIM), Just-In-Time (JIT), and 5S, to reduce waste and improve efficiency: the methodology combined literature review, expert interviews, case studies, and data collection through questionnaires. Data analysis using SmartPLS software and Structural Equation Modeling showed that both techniques have a positive impact on project performance. LPS was particularly effective in reducing time waste, while VSM was more influential in decreasing costs and enhancing quality. These methods optimized workflows, managed resources more effectively, and eliminated unnecessary activities, resulting in improved productivity and a higher likelihood of achieving project goals, such as timely completion, cost control, and quality improvements. Employing Lean techniques in linear construction projects can significantly improve project costs and schedules, reduce waste, and ultimately lead to increased stakeholder satisfaction and overall success of linear construction projects. The findings suggest that project managers and clients can significantly enhance the success of linear projects by adopting lean construction practices. The proposed model serves as a valuable tool for identifying and minimizing waste in such projects.
No takes yet. Share an insight, caveat, or question.
Enayati et al. (2025) studied this question.
Synapse has enriched 10 related papers. Consider them for comparative context: