Answers are grounded in this paper and cite their sources.
We examine a class of single-machine scheduling problems with sequence-dependent setup times that arise in the context of semiconductor test operations. We present heuristics for the problems of minimizing maximum lateness with dynamic arrivals and minimizing number of tardy jobs. We exploit special problem structure to derive worst-case error bounds. The special problem structure also enables us to derive dynamic programming procedures for the problems where all jobs are available simultaneously.
No takes yet. Share an insight, caveat, or question.
Uzsoy et al. (1992) studied this question.
Synapse has enriched 10 related papers. Consider them for comparative context: