The aim of this paper is to compare the performance of two meta-heuristic methods proposed to solve the identical parallel machine scheduling problem with sequence dependent setup times. The goal is to minimize the makespan. The first algorithm is a tabu search based heuristic and the second a memetic approach, which combines a population-based method with local search procedures. As benchmarks for small-sized instances, optimal and lower bound values are used provided by a dichotomous search. For larger instances, the comparisons rely on the best known solutions provided by an exhaustive search variant of the tabu procedure.
No takes yet. Share an insight, caveat, or question.
Mendes et al. (2002) studied this question.
Synapse has enriched 5 related papers. Consider them for comparative context: