Answers are grounded in this paper and cite their sources.
In this work, we investigate how various surrogate models representing an electrolyser’s production curve influence mixed-integer linear programming (MILP) optimisation outcomes. We compare linear, piecewise-linear, and scalable piecewise-linear models, each fitted to a physical electrolyser model, and analyse their effects on hydrogen production overestimation and real revenue in a solar farm/electrolyser array case study. Additionally, we employ a MILP implementation of a rectified linear unit (ReLU) neural network as a surrogate model. The results indicate that using simple linear models can significantly overestimate hydrogen production due to their inability to capture the non-linearity of the component’s efficiency. This overestimation correlates with reduced real revenues. In contrast, the adoption of simple piecewise models can boost returns by up to 14% in this scenario. The findings indicate that simple enhancements to the detail of component models can substantially improve system-level performance and yield more reliable results, without greatly increasing computational demands. While electrolysers were used as a case study, this analysis can be extrapolated and applied to additional components for which surrogate models are required in order to be included in larger energy system models. • The effects of surrogate model choices of an electrolyser component are studied. • Piecewise-linear fits and ReLU neural networks are implemented as surrogate models. • Ignoring electrolyser production non-linearity affects MILP optimisation outcomes. • Linear models can significantly overestimate hydrogen production and reduce revenue. • Study findings are applicable to non-linear components across various energy systems.
No takes yet. Share an insight, caveat, or question.
Fordham et al. (2025) studied this question.
Synapse has enriched 10 related papers. Consider them for comparative context: