A methodology for scheduling independent jobs with due dates on identical, parallel machines is presented. The jobs have different levels of importance and various processing times on the machines, and the objective is to minimize the total weighted job tardiness of the schedule. Since the problem is NP hard, the goal is not to obtain the optimal schedule. Rather, an efficient near-optimal algorithm based on Lagrangian relaxation is presented. This approach provides a lower bound on the cost, which can be used as a measure of suboptimality. According to an implementation for a work center at Pratt and Whitney, most schedules generated are within 1% of the optima with reasonable CPU times. Furthermore, the method provides valuable job interaction information, which shop floor management uses to answer 'what if' questions, to reconfigure the schedule to accommodate dynamic changes, and to schedule new jobs.>
No takes yet. Share an insight, caveat, or question.
Luh et al. (1990) studied this question.
Synapse has enriched 10 related papers. Consider them for comparative context: