Answers are grounded in this paper and cite their sources.
The Conemaugh 500-kV system stability studies indicated that stability was achieved for all faults that were cleared in 4.5 cycles. If a breaker fails to clear a 3-phase fault, it is necessary to resort to a breaker failure timing scheme of 7.5 cycles and to down grade the fault to a single phase-to-ground fault by independent pole operation of the circuit breaker in order to maintain stability. To cover abnormal conditions when instability may still occur, out-of-step relays on generators are being applied to trip the unit when the first unstable swing appears in the unit transformer.
No takes yet. Share an insight, caveat, or question.
Holland et al. (1971) studied this question.
Synapse has enriched 10 related papers. Consider them for comparative context: