Answers are grounded in this paper and cite their sources.
Following the Exxon-Valdez incident the, Oil Pollution Act was enacted by the US government in 1990 mandating double hull construction tankers operating in US coastal tankers. Traditional Cost Benefit Analysis to investigate whether this requirement is cost efficient does not include the timing of the implementation in anticipation of technological improvements or other system changes. We investigate the option value of waiting by applying the standard model for optimal timing of environmental policy We demonstrate that neglecting the occurrence of extreme events can be misleading.
No takes yet. Share an insight, caveat, or question.
Dikos et al. (2008) studied this question.
Synapse has enriched 5 related papers. Consider them for comparative context: