Answers are grounded in this paper and cite their sources.
In most types of high voltage apparatus, a PD acceptance test is required. In contrast, the PD test is very rarely used as an acceptance test for new motor and generator windings. The closest that machine manufacturers come to a PD acceptance test is the power factor tip-up test (IEEE Standard 286), which is an indirect PD test. The tip-up test is sensitive to PD sources when testing individual coils/bars but is relatively insensitive when testing complete windings, due to the presence of stress relief coatings. The lack of a direct PD acceptance test fundamentally results from the inductive nature of a stator winding. This article discusses the reasons for the lack of an absolute PD measurement criteria for stator windings, after a discussion on measurement methods and the quantities used to measure PD activity.
No takes yet. Share an insight, caveat, or question.
G.C. Stone (1998) studied this question.
Synapse has enriched 10 related papers. Consider them for comparative context: