Answers are grounded in this paper and cite their sources.
The change of load of the transformer substation TS 10 / 0,4 kV in the mode of maximum and minimum load is measured. It is noted that the process is nonstationary at the daily interval. Hourly intervals of time are highlighted on the daily graph of electrical load, the study of the law of distribution is conducted, and the normal law of distribution is confirmed by Pearson's criterion. The stationarity test was performed on parametric tests, namely the verification of the Fisher's Fisher's constant variance and the mathematical expectation of the Student's t-test and the correlation function.The values of numerical characteristics were obtained at the stationary areas and a probabilistic mathematical model of the TS 10 / 0.4 kV load was constructed.
No takes yet. Share an insight, caveat, or question.
I. A. Shcherbak (2019) studied this question.
Synapse has enriched 10 related papers. Consider them for comparative context: