Traditional deterministic project scheduling often proves unreliable in contexts where uncertainty compromises risk management, particularly in projects that utilize disruptive technologies. This study applied Monte Carlo simulation with Beta-PERT distributions to analyze the construction duration uncertainty of a rural housing prototype with prefabricated 3D-printed walls. The results indicate that the total project duration follows a probabilistic distribution with a mean of 46.7 days (SD = 1.4 days). The deterministic Critical Path Method (CPM) estimate of 44.5 days yields only a 10% completion probability, highlighting its inability to capture uncertainty. Conversely, the probabilistic analysis suggests that a duration of approximately 48 days is required to achieve an 80% confidence level. The sensitivity analysis identified ground slab construction, non-structural wall installation, and roof assembly as the primary variance contributors (over 41%). These findings demonstrate that probabilistic scheduling effectively incorporates uncertainty and supports critical activity prioritization, thereby enabling informed technical decision-making in variable construction environments.
No takes yet. Share an insight, caveat, or question.
Jara et al. (2026) studied this question.
Synapse has enriched 10 related papers. Consider them for comparative context: