This paper presents a new adaptation of the simulated annealing algorithm for solving non-preemptive resource-constrained project scheduling problems in which resources are limited but renewable from period to period. This algorithm is able to handle single-mode and multi-mode problems and to optimize different objective functions. Statistical experiments show the efficiency of the proposed algorithm even in comparison to some Tabu search heuristics.
No takes yet. Share an insight, caveat, or question.
Fayez F. Boctor (1996) studied this question.
Synapse has enriched 5 closely related papers on similar clinical questions. Consider them for comparative context: