A mixed-integer linear programming approach to the planning of electrical-power networks is described. The method is based on an interpretation of fixed-cost transportation-type models, and includes both network security and costs of network losses. Both single-period and multitime-period planning problems are considered. A large general-purpose mathematical programming system is used to obtain solutions using branch-and-bound algorithms, and the practical aspects of organising the problems and controlling the branch-and-bound tree search within a modern m.p.s. package are discussed. Three case studies are presented for illustration: the optimal design of a 132 kV subtransmission system, the optimal time-phased design of the same system over. eight years, and the optimal layout and cable selection for a new housing-estate low-voltage network. The paper concludes by indicating potential further applications of the method for scheduling, for example, new plant at substations.
No takes yet. Share an insight, caveat, or question.
Adams et al. (1974) studied this question.
Synapse has enriched 10 related papers. Consider them for comparative context: