Identifies optimal material testing procedure, suggesting significant cost reduction in interventions.
This paper presents a predicted information and predicted action (PIPA) decision-analysis approach with Bayesian material updating for planning material testing in existing reinforced concrete members. The objective is to select the number of concrete and reinforcing-steel tests before testing is performed and before a management action is chosen, accounting jointly for the updated structural performance, information-acquisition costs, action costs, and expected failure consequences. Predicted future test outcomes are used to update the material-strength distributions; the updated distributions are then propagated through the shear, flexural, and system reliability analyses to inform outcome-dependent action selection. Management interventions are modelled as system-state actions through action-dependent system failure probabilities. The optimal testing option is identified by minimising a total predicted-information and predicted-action cost-and-risk measure that combines information and expected action costs with the expected consequences of the system states. The approach is applied to a benchmark reinforced-concrete member with transverse shear reinforcement and uncertain concrete compressive strength and reinforcing-steel yield strength, in which the same steel-strength population is adopted for the longitudinal and transverse reinforcement. The decision-optimal testing option consists of six concrete tests and three reinforcing-steel tests, reducing the total expected decision cost-and-risk measure by approximately 58.2% relative to the no-new-information decision. The decision value arises mainly from avoiding unnecessary intervention when favourable material information is acquired. The results formulate material-test planning as a decision-value problem, providing an alternative to fixed sample-size rules while retaining explicit dependence on structural, probabilistic, action, and cost assumptions.
No takes yet. Share an insight, caveat, or question.
Palma et al. (2026) studied this question.
Synapse has enriched 10 related papers. Consider them for comparative context: