Answers are grounded in this paper and cite their sources.
Renewable power producers’ commitments in the day-ahead (DA) market may face uncertainties and deviations, necessitating swift adjustments in the intraday timeframe. This paper introduces a novel daily capacity-based market, the “Pre-contracting Flexibility Market” (or simply “PreFlex”). PreFlex enables intermittent generation units, specifically Wind Power Producers (WPPs), to contract Distributed Energy Resources (DERs) for flexibility. This enhances the WPP’s ability to counter potential deviations, primarily addressed during the intraday stage. The PreFlex market operates in two steps: first, before the closure of the DA market, the WPPs contract flexibility capacity from DERs through aggregators; second, in parallel with the intraday market, the WPPs activate the acquired capacity to offset predictive generation errors. Using two-stage stochastic optimization models, a comprehensive analysis has been conducted within the Norwegian power market context. The results demonstrate significant benefits for the WPPs by reducing the exposure to imbalance penalties and intraday market illiquidity risks. In addition, from the independent system operator’s perspective, the analysis indicates that introducing the PreFlex market reduces median system imbalances. However, the total costs of procuring and maintaining balancing reserves would not be considerably reduced, as sufficient reserves are needed to cover peak imbalances, which will not be affected by the PreFlex market.
No takes yet. Share an insight, caveat, or question.
Rognes et al. (2025) studied this question.
Synapse has enriched 10 related papers. Consider them for comparative context: