Answers are grounded in this paper and cite their sources.
This paper focuses on the distributed two-stage assembly flowshop scheduling problem for minimising a weighted sum of makespan and mean completion time. This problem involves two inter-dependent decision sub-problems: (1) how to allocate jobs among factories and (2) how to schedule the assigned jobs at each factory. A mathematical model is formulated for solving the small-sized instances of the problem. Since the NP-hardness of the problem, we also proposed a variable neighbourhood search (VNS) algorithm and a hybrid genetic algorithm combined with reduced variable neighbourhood search (GA-RVNS) to solve the distributed two-stage assembly flowshop scheduling problems and approximately optimise makespan and mean completion time simultaneously. Computational experiments have been conducted to compare the performances of the model and proposed algorithms. For a set of small-sized instances, both the model and the proposed algorithms are effective. The proposed algorithms are further evaluated on a set of large-sized instances. The results statistically show that both GA-RVNS and VNS obtain much better performances than the GA without RVNS-based local search step (GA-NOV). For the instances with small numbers of jobs, VNS achieves better performances than GA-RVNS. However, for the instances with large numbers of jobs, GA-RVNS yields better performances than the VNS. It is also shown that the overall performances of VNS are very close to GA-RVNS with different numbers of factories, weights given to makespan and numbers of machines at the first stage.
No takes yet. Share an insight, caveat, or question.
Xiong et al. (2014) studied this question.
Synapse has enriched 10 related papers. Consider them for comparative context: