Answers are grounded in this paper and cite their sources.
Context: Job sequencing has been approached from a static perspective, without considering the occurrence of unexpected events that might require modifying the schedule, thereby affecting its performance measures. Method: This paper presents the development and application of a genetic algorithm to the Job Shop Rescheduling Problem (JSRP), a reprogramming of the traditional Job Shop Scheduling Problem. This novel approach seeks to repair the schedule in such a way that theoretical models accurately represent real manufacturing environments. Results: The experiments designed to validate the algorithm aim to apply five classes of disruptions that could impact the schedule, evaluating two performance measures. This experiment was concurrently conducted with a genetic algorithm from the literature in order to facilitate the comparison of results. It was observed that the proposed approach outperforms the genetic algorithm 65% of the time, and it provides better stability measures 98% of the time. Conclusions: The proposed algorithm showed favorable outcomes when tested with well-known benchmark instances of the Job Shop Scheduling Problem, and the possibility of enhancing the tool's performance through simulation studies remains open.
No takes yet. Share an insight, caveat, or question.
Beltrán-Bernal et al. (2024) studied this question.
Synapse has enriched 10 related papers. Consider them for comparative context: