Answers are grounded in this paper and cite their sources.
One of the important considerations in the analysis of earthen dams is seepage from the dam body or its foundation. To the best of the authors’ knowledge, a detailed investigation of uplift force and hydraulic gradient around vertical cutoff walls has not been carried out for earthen dams yet. In this study, seepage, uplift force, and hydraulic gradient are calculated for the Doiraj Dam in Iran. Using measured seepage rates from the dam, validation of the numerical simulation is carried out. The results show that annually, the seepage rate passing through the dam is about 0.17% of the dam reservoir capacity. The inner side of a cutoff wall (under the dam clay core) has a greater effect on head loss than the outer side. Unlike for the water pressure heads, the variation of the hydraulic gradient for inner/outer cutoff wall sides are the same.
No takes yet. Share an insight, caveat, or question.
Salmasi et al. (2025) studied this question.
Synapse has enriched 10 related papers. Consider them for comparative context: