Answers are grounded in this paper and cite their sources.
Flexible alternating current transmission system (FACTS) devices can regulate the active and reactive power as well as voltage-magnitude. Placement of these devices in suitable locations can lead to the control of line power flow, bus voltages and short circuit currents at desired levels and, as a result, improvement of power system security margins. This paper presents an optimal allocation algorithm for FACTS devices based on a novel m-objective particle swarm optimization method considering both power system costs and security. The proposed algorithm has successfully been applied to an IEEE 30-bus power system and the results are presented and discussed.
No takes yet. Share an insight, caveat, or question.
Baghaee et al. (2012) studied this question.
Synapse has enriched 10 related papers. Consider them for comparative context: