This is the authors' abstract. We don't add key points for this paper.
To realize the potential of the integrated electrical-heating systems (IEHS) for coping with the uncertain renewable energy, a reserve scheduling model based on the dynamic programming transformed multi-stage adaptive robust optimization (DMRO) is proposed in this paper. The DMRO model enforces the non-anticipativity of scheduling process via temporal decomposed framework, and enhances the formulation flexibility for time-coupled equipment, such as energy storage systems (ESS). The whole scheduling model is split into two problems under the decomposition constructure, which consists of a reserve interval generation (RG) problem for making the unit commitment and systems' reserve plan, and a multi-stage economic operation (EO) problem aiming with simulating the worst-case scheduling process. To obtain the global optimal, a nested Benders decomposition algorithm is employed to solve the DMRO model. Case studies on the 6-Bus-5-node IEHS and the 118-Bus-24-node IEHS demonstrate the effectiveness of the proposed model and the solution methodology.
Answers are grounded in this paper and cite their sources.
No takes yet. Share an insight, caveat, or question.
Xiong et al. (2023) studied this question.
Synapse has enriched 10 related papers. Consider them for comparative context: