Answers are grounded in this paper and cite their sources.
Understanding the scour process around bridge piers and investigating approaches to reduce these phenomena is an important issue for engineers. Side-by-side piers cause lower scour depth compared to a single pier with the same diameter. In this study, the application of downstream bed sill and continuous footing to control the scour depth around single piers and two side-by-side piers is investigated experimentally. The results show that by using a continuous footing with a thickness equal to the pier diameter, the scour depth in front of the pier is reduced by 50% and 55% for single pier and side-by-side piers, respectively. Moreover, when the continuous footing thickness is doubled, no scour depth is observed in front of the pier. Additionally, incorporating a downstream bed sill adjusted to the pier results in a reduction of approximately 30% in scour depth in front of the piers.
No takes yet. Share an insight, caveat, or question.
Movahedi et al. (2024) studied this question.
Synapse has enriched 10 related papers. Consider them for comparative context: