This is the authors' abstract. We don't add key points for this paper.
Demand response (DR) can be counted as an effective congestion management method in power systems. However, appointing the optimal buses for the demand response programs (DRPs) implementation is one of the main challenges for the power system operators. In this paper, a new procedure has been developed by which the optimal locations and times of DRPs implementation are determined. Optimal buses are identified based on the power transfer distribution factors (PTDFs), available transfer capability, and dynamic dc optimal power flow problem. Applying the developed method results in reducing lines' congestion, increasing customers, and independent system operator's benefits, improving load curve's characteristics, preventing line outages and black outs, and consequently increasing the network reliability. The proposed method has been applied on the IEEE 39-bus New England test system. Results indicate the effectiveness and practical benefits of the proposed method.
No takes yet. Share an insight, caveat, or question.
Dehnavi et al. (2016) studied this question.
Synapse has enriched 5 closely related papers on similar clinical questions. Consider them for comparative context:
More from IEEE Transactions on Power Systems