Answers are grounded in this paper and cite their sources.
The rapid growth of renewable energy has increased the demand for adjustable load resources. As energy-intensive industrial loads, cement plants can provide significant flexibility to the power system through production scheduling. The rigidity of cement production processes limits the ability to participate in demand response (DR). To address this issue, a flexible-resource production scheduling method and an adjustable-capacity quantification model are proposed in this paper. First, a flexible-resource production scheduling based on a state task network (STN) is developed to ensure economic operation of cement plants. Second, the maximum adjustable-capacity boundary is derived from the flexible-resource scheduling. Within this boundary, the DR-driven adjustment potential is evaluated, and a parametric mapping from DR incentives to the optimal adjustment duration is established. Finally, a case study shows that the proposed scheduling reduces energy costs by 3.24%. Moreover, the proposed method provides a precise evaluation of equipment adjustment capacity while maintaining economic efficiency. The study provides guidance for improving the participation of cement plants in DR programs.
No takes yet. Share an insight, caveat, or question.
Wang et al. (2026) studied this question.
Synapse has enriched 10 related papers. Consider them for comparative context: