Authors
The new facility for the Large Hadron Collider (LHC) will mainly consist of a 27-km-long double ring of high-field superconducting magnets installed in the Large Electron-Positron Collider (LEP) tunnel, above the LEP machine components. The magnet system comprises nearly 2000 twin-aperture, 8-10-T, 10-m-long, dipole bending magnets, more than 500 250-T/m, twin-aperture quadrupoles, and a very large number of other superconducting magnetic components. A general description of the system is given together with the main features of the design of the regular lattice magnets. Also described is the present state of the magnet R&D program, which, after the successful phase of short model magnets, is now aimed at the construction of a full prototype 100-m-long cell for the LHC machine.
No takes yet. Share an insight, caveat, or question.
R. Perin (1991) studied this question.
Synapse has enriched one closely related paper. Consider it for comparative context: