Answers are grounded in this paper and cite their sources.
Summary Shell U.K. E&P (Shell Expro), operator in the U.K. North Sea on behalf of Shell and Esso, plans to drill 20 high-pressure wells during the next 2 years. The well design is based on new standards developed after the U.K. Dept. of Energy restriction on high-pressure drilling in the autumn of 1988. Studies were carried out to optimize casing design and drilling performance on these wells. Several casing schemes, including a slim-hole option, were analyzed. The material specifications for casing and drillpipe were reviewed to ensure that they met the loads imposed during drilling, well-control, and well-testing operations. The requirement for sour-service material was weighted against possible H2S adsorption by the mud film. As a result, a new drillstring and two high-pressure casing schemes have been specified. The high-pressure casing scheme used depends on the maximum expected surface pressure.
No takes yet. Share an insight, caveat, or question.
Krus et al. (1991) studied this question.
Synapse has enriched 10 related papers. Consider them for comparative context: