Answers are grounded in this paper and cite their sources.
Simulation study evaluates latency governance for boost-phase intercept timelines, demonstrating automated response feasibility within a five-millisecond budget.
Version 8.1 (16 August 2026). New version of 10.5281/zenodo.19368682 (v7, 31 March 2026). Architecture, thresholds, and simulation results are unchanged. What changed since v7 §1. Program-office confirmation of the automation dial. At the Space and Missile Defense Symposium (11 August 2026) the Golden Dome director described an operator-selectable setting from none to fully automated response, and said the fight will move toward automation at machine speed (Aviation Week; Defense Daily). §2.1. Fielded-state note on the ISL mesh. SDA had not demonstrated an operating Tranche 1 optical crosslink mesh as of mid-July 2026 (Breaking Defense). Every ISL-dependent path (hub relay, P2 time transfer, Check 6 quorum) is a design assumption, not a fielded capability. §4.1 / Figure F. Clock-trust FPGA reference diagram (supplementary file clock_trust_fpga_dark_v2.png): t_auth exits the provenance validator and enters Check 4 only; Clock Arbiter (not "Priority selector"); attack arrows land on GPS receiver, provenance validator, and ISL optical link. Timing windows labeled notional. §4.5, 5, 7, 10, 11. Multi-node deconfliction, hub-tier swap protocol, program calendar (SBI Gate 1 of 4 closed August 2026; ground tests 2026, flight demos 2027, initial capability 2028, intercept demos not before mid-2029), and a quantization-conditioned-backdoor gate on replacement hub models. Build Doc pointer updated from V1.2 to V1.4.2. New §12 postscript recording the March-to-August delta. This PDF (8.1 claim hygiene, relative to unpublished v8). Stripped false-precision confidence intervals from parametric Monte Carlo prose (Sections 6.4, 11); added a scalar-model caveat (Section 6.4); qualified the PINN entropy claim (Section 4.1); condensed the AI use statement. What did not change. The 7-check matrix, the 5 ms budget, the clock-trust requirement, the simulation results (approximately 99% at s=0.74, 89% at s=1.0, 62% PINN-zeroed), and the Phase GD-0 open items. Hardware characterization remains the gate.
No takes yet. Share an insight, caveat, or question.
Daniyel Yaacov Bilar (2026) studied this question.
Synapse has enriched 8 closely related papers on similar clinical questions. Consider them for comparative context: