Answers are grounded in this paper and cite their sources.
The planning of a rail system requires the definition of travel demand in terms of passenger (or freight) flows for sizing physical and technological elements (such as number of trains, signalling system type, length and width of platforms). Moreover, once a system has been set up and functional elements have been acquired, system management in terms of services and related timetables requires knowledge of travel demand flows. Much has been written about the methods and techniques for estimating travel demand by means of analytical models (calibrated by surveys), statistical processing of survey data and/ or correcting model results by using properly collected traffic counts. However, whatever the adopted approach, it is necessary to proceed with survey campaigns to acquire experimental data. Obviously, the greater the number of detected data (and related acquisition costs and times), the greater the accuracy of travel demand estimations. Hence, in real cases, a fair compromise between survey costs and estimation accuracy has to be struck.
No takes yet. Share an insight, caveat, or question.
Mauro et al. (2017) studied this question.
Synapse has enriched 10 related papers. Consider them for comparative context: