Answers are grounded in this paper and cite their sources.
This paper presents an approach to determining the optimum number of machines, and their operating rates, for each machine center in a serial-flow production system. Computational comparisons are given to solve this problem using dynamic programming and a standard mixed-integer programming package.
No takes yet. Share an insight, caveat, or question.
Hayes et al. (1981) studied this question.
Synapse has enriched 10 related papers. Consider them for comparative context: