This paper presents a new approach for the optimal long-range generation planning. A completely new analytical approach for the production costing model and reliability measure is developed under the assumption of Gaussian probabilistic distribution of random load fluctuations and plant outages. The long-range generation investment problem is formulated as an optimal control problem to determine optimally the annual investment in new generation capacity. The Hamiltonian minimization is performed by using a version of the gradient projection method.
No takes yet. Share an insight, caveat, or question.
Park et al. (1985) studied this question.
Synapse has enriched 3 closely related papers on similar clinical questions. Consider them for comparative context: