Answers are grounded in this paper and cite their sources.
This paper presents a method for economic planning of transmission networks in an iterative manner. The method is capable of solving large scale networks where the most "worst" new lines are deleted iteratively using heuristic rules. In each iteration, a relatively small size non-linear mathematical Programming model is built to enhance the deletion process. The non-linear model is based on full AC load flow where only the reactive power injected from different available reactive power sources are controlled plus the reference bus voltage magnitude. The deletion process is stopped when the deleting of any line from the rest set of lines gives an infeasible solution. The presented method is verified through its application to 19-bus system.
No takes yet. Share an insight, caveat, or question.
Lotfy et al. (2023) studied this question.
Synapse has enriched 10 related papers. Consider them for comparative context: