Answers are grounded in this paper and cite their sources.
In this paper, single-machine scheduling problems with proportional linear deterioration effects and common due window assignment simultaneously are considered. Two different objective functions are studied, the first is to minimize the sum of the number of early jobs, number of tardy jobs and due window location and due window size, the second is to minimize the sum of the earliness cost, tardiness cost, due window location and due window size. Optimality properties for all problems are provided and polynomial time algorithms for solving these problems are given.
No takes yet. Share an insight, caveat, or question.
Huang et al. (2019) studied this question.
Synapse has enriched 10 related papers. Consider them for comparative context: